# #Mon Aug 09 11:52:47 CEST 2010 Text__0EnzkKObEd-WfYQ0GneCwQ_title=Ready on the drawing board\: ITER, the first experimental reactor

Text__0EnzkKObEd-WfYQ0GneCwQ_text=International Thermonuclear Experimental Reactor

Partners\: Europe, Russia, Japan, USA, China, South Korea (Canada participates via the EU)

Ready on the drawing board first in 1998, revision for cost reduction after disembarkment (1999) of the USA until 2001

After re-embarkment of the USA and accession of South Korea is the future location under debate for a time since the end of 2003 - a political stalemate situation in the obvious context of constellations around the Iraq War. At June 28, 2005, the decision is taken at last at a meeting in Moscow\: Cadarache in southern France.

ITER is designed to bring the 'missing' factor 6 of the triple product of temperature, density and confinement time.